Road Conditions | PostIndependent.com

Road Conditions


List View Grid View
  • Road
    Conditions
    Updated
    Hazard
    Alert
  • Rifle -Glenwood Springs
    Dry
    3 hours ago
    No
    ROAD ALERT:Rifle -Glenwood SpringsWest : Silt to Canyon Creek
    Road Work
    MM98
    MM109
    I-70 Westbound Silt to Canyon Creek (Milemarker 98-109) (through December 2020)
    HDPE Conduit installation
    ROAD ALERT:Rifle -Glenwood SpringsEast : 19 locations on the Northside of Glenwood Canyon between MP 116 to 133, Eagle and Garfield Counties
    Road Work
    MM116
    MM133
    I-70 Eastbound / Westbound Glenwood Canyon 19 locations on the Northside of Glenwood Canyon between MP 116 to 133, Eagle and Garfield Counties (Milemarker 116-133) (through February 2021)
    This emergency safety project will repair and replace 17 rockfall fences on the northside of Glenwood Canyon that were damaged during the Grizzly Creek Fire. Two new rockfall fences will also be installed.
    ROAD ALERT:Rifle -Glenwood SpringsEast : I-70 Glenwood Canyon, Garfield and Eagle Counties
    Road Work
    MM116
    MM133
    I-70 Eastbound / Westbound Glenwood Canyon I-70 Glenwood Canyon, Garfield and Eagle Counties (Milemarker 116-133) (through November 2020)
    This 6.2-mile improvement project includes placement of thin bonded polyester concrete, replacement of bridge joints and bearings, pavement markings and ADA ramp improvements at rest areas. To complete the improvements, traffic control shifting westbound traffic down to the eastbound driving deck will be required (one lane in each direction).
  • Glenwood Springs-Eagle
    Dry
    3 hours ago
    No
    ROAD ALERT:Glenwood Springs-EagleEast : On I-70 in the Glenwood Canyon west of Glenwood Springs
    Road Work
    MM117
    MM117.97
    I-70 Eastbound / Westbound On I-70 in the Glenwood Canyon west of Glenwood Springs (Milemarker 117-117.97) (through February 2022)
    Slotted drain installation for storm water management Removal of old lighting system and installation of new lighting system. Programming and integration of lighting control center.
    ROAD ALERT:Glenwood Springs-EagleWest : East Side of Hanging Lake Tunnel
    Road Work
    MM125
    MM127
    I-70 Westbound / Eastbound East Side of Hanging Lake Tunnel (Milemarker 125-127) (through December 2020)
    Work involving Holy Cross Energy power pole removal, repairs and Switchgear replacement. All work required due to fire damage.
    ROAD ALERT:Glenwood Springs-EagleEast : On I-70 east of Glenwood Springs
    Road Work
    MM118
    MM131
    I-70 Eastbound / Westbound On I-70 east of Glenwood Springs (Milemarker 118-131) (through April 2021)
    Work will include the removal of worn out signs, installation of over 300 new signs and installation of 160 new posts. New signs will be installed at approximately 300 locations along I-70, on four on/off ramps and rest areas within the project limits. The new regulatory, warning and guidance signs will have better reflectivity at night to hep motorists navigate the highway safely.
    ROAD ALERT:Glenwood Springs-EagleEast : 19 locations on the Northside of Glenwood Canyon between MP 116 to 133, Eagle and Garfield Counties
    Road Work
    MM116
    MM133
    I-70 Eastbound / Westbound Glenwood Canyon 19 locations on the Northside of Glenwood Canyon between MP 116 to 133, Eagle and Garfield Counties (Milemarker 116-133) (through February 2021)
    This emergency safety project will repair and replace 17 rockfall fences on the northside of Glenwood Canyon that were damaged during the Grizzly Creek Fire. Two new rockfall fences will also be installed.
    ROAD ALERT:Glenwood Springs-EagleEast : I-70 Glenwood Canyon, Garfield and Eagle Counties
    Road Work
    MM116
    MM133
    I-70 Eastbound / Westbound Glenwood Canyon I-70 Glenwood Canyon, Garfield and Eagle Counties (Milemarker 116-133) (through November 2020)
    This 6.2-mile improvement project includes placement of thin bonded polyester concrete, replacement of bridge joints and bearings, pavement markings and ADA ramp improvements at rest areas. To complete the improvements, traffic control shifting westbound traffic down to the eastbound driving deck will be required (one lane in each direction).
    ROAD ALERT:Glenwood Springs-EagleWest : between Copper Mountain and Dotsero
    Road Work
    MM216
    MM136
    I-70 Westbound / Eastbound between Copper Mountain and Dotsero (Milemarker 216-136) (through December 2020)
    Placement of microducts and cables in CDOT duct. Requiring right shoulder closures WB from 136-216, also short term lane closures if needed.
  • Eagle-Vail
    Dry
    3 hours ago
    No
    ROAD ALERT:Eagle-VailWest : Exit 169 in Northwestern Colorado
    Road Work
    MM169
    MM169
    I-70 Westbound Exit 169 in Northwestern Colorado (Milemarker 169-169) (through April 2022)
    Joint project between CDOT and ITS Group, conduit work
    ROAD ALERT:Eagle-VailEast : On I-70 near Vail CO
    Road Work
    MM172
    MM187
    I-70 Eastbound / Westbound On I-70 near Vail CO (Milemarker 172-187) (through November 2020)
    Work will consist of hot mix asphalt (HMA) overlay, rumble strip installation, new guardrail, bridge-deck repairs, striping, drainage improvements, sign installation and erosion control.
  • Vail-Vail Pass
    Dry
    3 hours ago
    No
    ROAD ALERT:Vail-Vail PassEast : On I-70 near Vail CO
    Road Work
    MM172
    MM187
    I-70 Eastbound / Westbound On I-70 near Vail CO (Milemarker 172-187) (through November 2020)
    Work will consist of hot mix asphalt (HMA) overlay, rumble strip installation, new guardrail, bridge-deck repairs, striping, drainage improvements, sign installation and erosion control.
    ROAD ALERT:Vail-Vail PassEast : I-70 eastbound at the 189.75
    Road Work
    MM189
    MM189.85
    I-70 Eastbound I-70 eastbound at the 189.75 (Milemarker 189-189.85) (through November 2020)
    CC Enterprises will be closing the right lane on eastbound I-70 between MM189 and MM189.85 for sign base installation at MM 189.75. Lane closure begins at noon and will be picked up at approximately 4:00 PM.
  • Vail Pass-Copper Mtn
    Dry
    3 hours ago
    No
    ROAD ALERT:Vail Pass-Copper MtnEast : I-70 eastbound at the 189.75
    Road Work
    MM189
    MM189.85
    I-70 Eastbound I-70 eastbound at the 189.75 (Milemarker 189-189.85) (through November 2020)
    CC Enterprises will be closing the right lane on eastbound I-70 between MM189 and MM189.85 for sign base installation at MM 189.75. Lane closure begins at noon and will be picked up at approximately 4:00 PM.
  • Copper Mtn-Silverthorne
    Dry
    3 hours ago
    No
  • Silverthorne-Eisenhower/Johnson tunnels
    Dry
    3 hours ago
    No
    ROAD ALERT:Silverthorne-Eisenhower/Johnson tunnelsEast : The Eisenhower-Johnson Memorial Tunnel on I-70, Clear Creek and Summit Counties
    Road Work
    MM213.41
    MM215.67
    I-70 Eastbound / Westbound Eisehnower-Johnson Memorial Tunnels The Eisenhower-Johnson Memorial Tunnel on I-70, Clear Creek and Summit Counties (Milemarker 213.41-215.67) (through November 2020)
    Pavement resurfacing within both tunnels at the east and west approaches along with tunnel barrier repair.
  • Eisenhower/Johnson tunnels-Georgetown
    Snow
    1 hour ago
    Yes
    ROAD ALERT:Eisenhower/Johnson tunnels-GeorgetownWest : between Copper Mountain and Dotsero
    Road Work
    MM216
    MM136
    I-70 Westbound / Eastbound between Copper Mountain and Dotsero (Milemarker 216-136) (through December 2020)
    Placement of microducts and cables in CDOT duct. Requiring right shoulder closures WB from 136-216, also short term lane closures if needed.
    ROAD ALERT:Eisenhower/Johnson tunnels-GeorgetownEast : The Eisenhower-Johnson Memorial Tunnel on I-70, Clear Creek and Summit Counties
    Road Work
    MM213.41
    MM215.67
    I-70 Eastbound / Westbound Eisehnower-Johnson Memorial Tunnels The Eisenhower-Johnson Memorial Tunnel on I-70, Clear Creek and Summit Counties (Milemarker 213.41-215.67) (through November 2020)
    Pavement resurfacing within both tunnels at the east and west approaches along with tunnel barrier repair.
    ROAD ALERT:Eisenhower/Johnson tunnels-GeorgetownEast : Fraser, Co, Grand County, HWY 040A, MP: 226.60 and 228.43, ADA Ramps in the following locations: US HWY 40 and Park Ave., US HWY 40 and Fraser Ave., US HWY 40 and CR 72 - CR 804, US HWY 40 and Mid Block, US HWY 40 and Eisenhower Dr., US HWY 40 and Jo
    Road Work
    MM226.6
    MM228.43
    US 40 Eastbound / Westbound Fraser, Co, Grand County, HWY 040A, MP: 226.60 and 228.43, ADA Ramps in the following locations: US HWY 40 and Park Ave., US HWY 40 and Fraser Ave., US HWY 40 and CR 72 - CR 804, US HWY 40 and Mid Block, US HWY 40 and E
    This project consists of improvements to bring existing curb ramps into compliance with PROWAG requirements. The work to be performed includes improvements to curb ramps, curb and gutter and sidewalks. Curb ramp replacements are located in various areas throughout the towns of Kremmling, Granby, Fraser, Winter Park, Hot Sulphur Springs, and Walden.
  • Georgetown-Idaho Springs
    Dry
    3 hours ago
    No
    ROAD ALERT:Georgetown-Idaho SpringsWest : From the Veterans Memorial Tunnels to the Empire Interchange. Short-term closures: Single lane closures during overnight hours on EB and WB I-70 between MP 243 and MP 231.
    Road Work
    MM232
    MM247
    I-70 Westbound From the Veterans Memorial Tunnels to the Empire Interchange. Short-term closures: Single lane closures during overnight hours on EB and WB I-70 between MP 243 and MP 231. (Milemarker 232-247) (through April 2021)
    Construction of a managed toll lane on westbound I-70 from the Veterans Memorial Tunnels to the Empire Interchange. Other work includes sanitary and water line installation in Idaho Springs, electrical work and signage erection, and drainage and safety improvements site wide. Crews have completed civil construction of the new lane. Toll testing will begin in early 2021. Short-term closures: Single lane closures during overnight hours until Feb 1, 2021 on EB and WB I-70 between MP 243 and MP 231.
    ROAD ALERT:Georgetown-Idaho SpringsEast : Fraser, Co, Grand County, HWY 040A, MP: 226.60 and 228.43, ADA Ramps in the following locations: US HWY 40 and Park Ave., US HWY 40 and Fraser Ave., US HWY 40 and CR 72 - CR 804, US HWY 40 and Mid Block, US HWY 40 and Eisenhower Dr., US HWY 40 and Jo
    Road Work
    MM226.6
    MM228.43
    US 40 Eastbound / Westbound Fraser, Co, Grand County, HWY 040A, MP: 226.60 and 228.43, ADA Ramps in the following locations: US HWY 40 and Park Ave., US HWY 40 and Fraser Ave., US HWY 40 and CR 72 - CR 804, US HWY 40 and Mid Block, US HWY 40 and E
    This project consists of improvements to bring existing curb ramps into compliance with PROWAG requirements. The work to be performed includes improvements to curb ramps, curb and gutter and sidewalks. Curb ramp replacements are located in various areas throughout the towns of Kremmling, Granby, Fraser, Winter Park, Hot Sulphur Springs, and Walden.
    ROAD ALERT:Georgetown-Idaho SpringsEast : Winter Park, Co, Grand County, HWY 040A, Mp: 228.72 and 232.85, ADA Ramps in the following locations: US HWY 4 and Kings Crossing RD. - Telemark Dr., US HWY 40 and Rendezvous Way, US HWY 40 and High Country Dr., US HWY 40 and Cooper Creek Way, US HWY
    Road Work
    MM228.72
    MM232.85
    US 40 Eastbound / Westbound Winter Park, Co, Grand County, HWY 040A, Mp: 228.72 and 232.85, ADA Ramps in the following locations: US HWY 4 and Kings Crossing RD. - Telemark Dr., US HWY 40 and Rendezvous Way, US HWY 40 and High Country Dr., US HWY
    This project consists of improvements to bring existing curb ramps into compliance with PROWAG requirements. The work to be performed includes improvements to curb ramps, curb and gutter and sidewalks. Curb ramp replacements are located in various areas throughout the towns of Kremmling, Granby, Fraser, Winter Park, Hot Sulphur Springs, and Walden.
  • Idaho Springs-Genesee
    Dry
    3 hours ago
    No
    ROAD ALERT:Idaho Springs-GeneseeWest : From the Veterans Memorial Tunnels to the Empire Interchange. Short-term closures: Single lane closures during overnight hours on EB and WB I-70 between MP 243 and MP 231.
    Road Work
    MM232
    MM247
    I-70 Westbound From the Veterans Memorial Tunnels to the Empire Interchange. Short-term closures: Single lane closures during overnight hours on EB and WB I-70 between MP 243 and MP 231. (Milemarker 232-247) (through April 2021)
    Construction of a managed toll lane on westbound I-70 from the Veterans Memorial Tunnels to the Empire Interchange. Other work includes sanitary and water line installation in Idaho Springs, electrical work and signage erection, and drainage and safety improvements site wide. Crews have completed civil construction of the new lane. Toll testing will begin in early 2021. Short-term closures: Single lane closures during overnight hours until Feb 1, 2021 on EB and WB I-70 between MP 243 and MP 231.
  • Genesee-C470
    Dry
    3 hours ago
    No
  • Loveland Pass
    Icy Spots
    3 hours ago
    Yes
    ROAD ALERT:Loveland PassEast : Fraser, Co, Grand County, HWY 040A, MP: 226.60 and 228.43, ADA Ramps in the following locations: US HWY 40 and Park Ave., US HWY 40 and Fraser Ave., US HWY 40 and CR 72 - CR 804, US HWY 40 and Mid Block, US HWY 40 and Eisenhower Dr., US HWY 40 and Jo
    Road Work
    MM226.6
    MM228.43
    US 40 Eastbound / Westbound Fraser, Co, Grand County, HWY 040A, MP: 226.60 and 228.43, ADA Ramps in the following locations: US HWY 40 and Park Ave., US HWY 40 and Fraser Ave., US HWY 40 and CR 72 - CR 804, US HWY 40 and Mid Block, US HWY 40 and E
    This project consists of improvements to bring existing curb ramps into compliance with PROWAG requirements. The work to be performed includes improvements to curb ramps, curb and gutter and sidewalks. Curb ramp replacements are located in various areas throughout the towns of Kremmling, Granby, Fraser, Winter Park, Hot Sulphur Springs, and Walden.
    ROAD ALERT:Loveland PassEast : Winter Park, Co, Grand County, HWY 040A, Mp: 228.72 and 232.85, ADA Ramps in the following locations: US HWY 4 and Kings Crossing RD. - Telemark Dr., US HWY 40 and Rendezvous Way, US HWY 40 and High Country Dr., US HWY 40 and Cooper Creek Way, US HWY
    Road Work
    MM228.72
    MM232.85
    US 40 Eastbound / Westbound Winter Park, Co, Grand County, HWY 040A, Mp: 228.72 and 232.85, ADA Ramps in the following locations: US HWY 4 and Kings Crossing RD. - Telemark Dr., US HWY 40 and Rendezvous Way, US HWY 40 and High Country Dr., US HWY
    This project consists of improvements to bring existing curb ramps into compliance with PROWAG requirements. The work to be performed includes improvements to curb ramps, curb and gutter and sidewalks. Curb ramp replacements are located in various areas throughout the towns of Kremmling, Granby, Fraser, Winter Park, Hot Sulphur Springs, and Walden.
  • Granby-Winter Park
    Icy
    1 hour ago
    Yes
    ROAD ALERT:Granby-Winter ParkWest : between Copper Mountain and Dotsero
    Road Work
    MM216
    MM136
    I-70 Westbound / Eastbound between Copper Mountain and Dotsero (Milemarker 216-136) (through December 2020)
    Placement of microducts and cables in CDOT duct. Requiring right shoulder closures WB from 136-216, also short term lane closures if needed.
    ROAD ALERT:Granby-Winter ParkEast : The Eisenhower-Johnson Memorial Tunnel on I-70, Clear Creek and Summit Counties
    Road Work
    MM213.41
    MM215.67
    I-70 Eastbound / Westbound Eisehnower-Johnson Memorial Tunnels The Eisenhower-Johnson Memorial Tunnel on I-70, Clear Creek and Summit Counties (Milemarker 213.41-215.67) (through November 2020)
    Pavement resurfacing within both tunnels at the east and west approaches along with tunnel barrier repair.
    ROAD ALERT:Granby-Winter ParkEast : Fraser, Co, Grand County, HWY 040A, MP: 226.60 and 228.43, ADA Ramps in the following locations: US HWY 40 and Park Ave., US HWY 40 and Fraser Ave., US HWY 40 and CR 72 - CR 804, US HWY 40 and Mid Block, US HWY 40 and Eisenhower Dr., US HWY 40 and Jo
    Road Work
    MM226.6
    MM228.43
    US 40 Eastbound / Westbound Fraser, Co, Grand County, HWY 040A, MP: 226.60 and 228.43, ADA Ramps in the following locations: US HWY 40 and Park Ave., US HWY 40 and Fraser Ave., US HWY 40 and CR 72 - CR 804, US HWY 40 and Mid Block, US HWY 40 and E
    This project consists of improvements to bring existing curb ramps into compliance with PROWAG requirements. The work to be performed includes improvements to curb ramps, curb and gutter and sidewalks. Curb ramp replacements are located in various areas throughout the towns of Kremmling, Granby, Fraser, Winter Park, Hot Sulphur Springs, and Walden.
    ROAD ALERT:Granby-Winter ParkEast : Winter Park, Co, Grand County, HWY 040A, Mp: 228.72 and 232.85, ADA Ramps in the following locations: US HWY 4 and Kings Crossing RD. - Telemark Dr., US HWY 40 and Rendezvous Way, US HWY 40 and High Country Dr., US HWY 40 and Cooper Creek Way, US HWY
    Road Work
    MM228.72
    MM232.85
    US 40 Eastbound / Westbound Winter Park, Co, Grand County, HWY 040A, Mp: 228.72 and 232.85, ADA Ramps in the following locations: US HWY 4 and Kings Crossing RD. - Telemark Dr., US HWY 40 and Rendezvous Way, US HWY 40 and High Country Dr., US HWY
    This project consists of improvements to bring existing curb ramps into compliance with PROWAG requirements. The work to be performed includes improvements to curb ramps, curb and gutter and sidewalks. Curb ramp replacements are located in various areas throughout the towns of Kremmling, Granby, Fraser, Winter Park, Hot Sulphur Springs, and Walden.
  • I-70 to Winter Park (Berthoud Pass)
    Icy Spots
    1 hour ago
    Yes
    ROAD ALERT:I-70 to Winter Park (Berthoud Pass)West : From the Veterans Memorial Tunnels to the Empire Interchange. Short-term closures: Single lane closures during overnight hours on EB and WB I-70 between MP 243 and MP 231.
    Road Work
    MM232
    MM247
    I-70 Westbound From the Veterans Memorial Tunnels to the Empire Interchange. Short-term closures: Single lane closures during overnight hours on EB and WB I-70 between MP 243 and MP 231. (Milemarker 232-247) (through April 2021)
    Construction of a managed toll lane on westbound I-70 from the Veterans Memorial Tunnels to the Empire Interchange. Other work includes sanitary and water line installation in Idaho Springs, electrical work and signage erection, and drainage and safety improvements site wide. Crews have completed civil construction of the new lane. Toll testing will begin in early 2021. Short-term closures: Single lane closures during overnight hours until Feb 1, 2021 on EB and WB I-70 between MP 243 and MP 231.
    ROAD ALERT:I-70 to Winter Park (Berthoud Pass)East : Winter Park, Co, Grand County, HWY 040A, Mp: 228.72 and 232.85, ADA Ramps in the following locations: US HWY 4 and Kings Crossing RD. - Telemark Dr., US HWY 40 and Rendezvous Way, US HWY 40 and High Country Dr., US HWY 40 and Cooper Creek Way, US HWY
    Road Work
    MM228.72
    MM232.85
    US 40 Eastbound / Westbound Winter Park, Co, Grand County, HWY 040A, Mp: 228.72 and 232.85, ADA Ramps in the following locations: US HWY 4 and Kings Crossing RD. - Telemark Dr., US HWY 40 and Rendezvous Way, US HWY 40 and High Country Dr., US HWY
    This project consists of improvements to bring existing curb ramps into compliance with PROWAG requirements. The work to be performed includes improvements to curb ramps, curb and gutter and sidewalks. Curb ramp replacements are located in various areas throughout the towns of Kremmling, Granby, Fraser, Winter Park, Hot Sulphur Springs, and Walden.